Germantown Academy, a fully accredited, private, PreK–12 school with an enrollment of 1,080 students, was preparing to demolish and rebuild (within the same footprint) both the Middle and Upper School facilities. The goal was to meet the current student’s needs, as well as future technological expansion, all while maintaining network, data, voice, and alarm systems for the entire campus during the one-year construction project.